Project Portfolio

Explore our completed and ongoing construction projects

Commercial Court
Commercial Court
Commercial Court
Commercial Court
Commercial 24 Months SAR 70,500,000 Al-Shiddi Company 12,000 m²

المحكمة التجاريه - Commercial court

The Commercial Court project is a fully integrated development executed by Engineering Circle General Contracting Company for Al-Shiddi Company. The project was designed and constructed to the highest standards, blending traditional elegance with modern architectural elements.

Scope of Work:

    Structural works

  • Full concrete raft foundation across the building footprint
  • Reinforced concrete walls for the basement
  • Flat slab roof systems
  • Facade Works

  • High-end architectural facade combining natural stone and glass
  • Aluminum and glass works executed by Sakani Homes Factory
  • Interior Finishes

  • Premium marble and porcelain flooring
  • Ceramic tiling in restrooms
  • Decorative gypsum ceilings
  • Glass partitions exceeding 10,000 m², also executed by Sakani Homes Factory
  • Plastic wall paints and refined decorative finishes
  • MEP Works

  • Full HVAC systems across all floors
  • Complete ducting installations
  • Comprehensive electrical and mechanical systems, including auxiliary services

يُعد مشروع المحكمة التجارية من المشاريع المتكاملة التي نفذتها شركة دائرة الهندسة للمقاولات العامة لصالح شركة الشدي. تم تصميم وتنفيذ المشروع على أعلى مستوى من الجودة، وبمزيج يجمع بين الأصالة والحداثة في الشكل والمضمون.

نطاق العمل:

    الأعمال الإنشائية:

  • تنفيذ لبشة خرسانية كاملة للمسطح
  • إنشاء حوائط خرسانية للبدروم
  • تنفيذ بلاطات أسقف مسطحة
  • الواجهات الخارجية:

  • تصميم معماري راقٍ يجمع بين الحجر الطبيعي والواجهات الزجاجية
  • تنفيذ أعمال الألمنيوم والزجاج من خلال مصنع سكنى هومز
  • التشطيبات الداخلية:

  • أرضيات من الرخام والبورسلين
  • سيراميك في دورات المياه
  • ديكورات جبسية للأسقف
  • قواطع زجاجية بمساحة تفوق 10,000 م² (من تنفيذ مصنع سكنى هومز)
  • دهانات بلاستيكية وأعمال ديكور داخلية مميزة
  • الأعمال الكهروميكانيكية:

  • أنظمة تكييف متكاملة لكافة الأدوار
  • تنفيذ أعمال الدكتات والتوصيلات
  • تنفيذ كافة أعمال الكهرباء والميكانيكا والأنظمة المساعدة
Red Palace
Red Palace
Red Palace
Residential 8 Months SR-3,795,000

القصر الاحمر - Red Palace

At Red Palace we had done several works including Concrete reinforcement works.

Project highlights:

  • Project Duration: 8 months
  • Scope of Work: Concrete reinforcement works
  • Project Value: SR-3,795,000

لقد قمنا في القصر الأحمر بالعديد من الأعمال بما في ذلك أعمال التسليح الخرساني

أبرز مميزات المشروع:

  • مدة المشروع: 8 أشهر
  • نطاق العمل: أعمال تدعيم خرسانية
  • قيمة المشروع: 3,795,000
Anas
Anas
Residential 15 Months SR-20,636,980

أنس بن مالك- Anas Bin Malik

Excavation, concrete works, building construction, and full finishing

Scope of Work:

  • Earthworks and grading
  • Pavement construction
  • Bridge construction
  • Drainage systems
  • Road signage and lighting

مشروع طريق ساحلي بطول 120 كم يربط المدن الرئيسية على طول البحر الأحمر مع 12 جسرًا و3 تقاطعات.

نطاق العمل:

  • أعمال الحفر والتسوية
  • إنشاء الرصف
  • بناء الجسور
  • أنظمة الصرف
  • لافتات وإضاءة الطريق
Saad
Infrastructure 42 Months $320 Million

سعد - Saad

A 120km coastal highway project connecting major cities along the Red Sea with 12 bridges and 3 interchanges.

Scope of Work:

  • Earthworks and grading
  • Pavement construction
  • Bridge construction
  • Drainage systems
  • Road signage and lighting

مشروع طريق ساحلي بطول 120 كم يربط المدن الرئيسية على طول البحر الأحمر مع 12 جسرًا و3 تقاطعات.

نطاق العمل:

  • أعمال الحفر والتسوية
  • إنشاء الرصف
  • بناء الجسور
  • أنظمة الصرف
  • لافتات وإضاءة الطريق
Electric Co
Electric Co
Electric Co
Infrastructure 42 Months $320 Million

شركة الكهرباء - Electric Co

A 120km coastal highway project connecting major cities along the Red Sea with 12 bridges and 3 interchanges.

Scope of Work:

  • Earthworks and grading
  • Pavement construction
  • Bridge construction
  • Drainage systems
  • Road signage and lighting

مشروع طريق ساحلي بطول 120 كم يربط المدن الرئيسية على طول البحر الأحمر مع 12 جسرًا و3 تقاطعات.

نطاق العمل:

  • أعمال الحفر والتسوية
  • إنشاء الرصف
  • بناء الجسور
  • أنظمة الصرف
  • لافتات وإضاءة الطريق
Al dahyan
Al dahyan
Al dahyan
Infrastructure 42 Months $320 Million

مكاتب الضحيان - Al dahyan Office

A 120km coastal highway project connecting major cities along the Red Sea with 12 bridges and 3 interchanges.

Scope of Work:

  • Earthworks and grading
  • Pavement construction
  • Bridge construction
  • Drainage systems
  • Road signage and lighting

مشروع طريق ساحلي بطول 120 كم يربط المدن الرئيسية على طول البحر الأحمر مع 12 جسرًا و3 تقاطعات.

نطاق العمل:

  • أعمال الحفر والتسوية
  • إنشاء الرصف
  • بناء الجسور
  • أنظمة الصرف
  • لافتات وإضاءة الطريق
Commercial Court
Commercial Court
Commercial Court
Infrastructure 42 Months $320 Million

مرسية - mursya

A 120km coastal highway project connecting major cities along the Red Sea with 12 bridges and 3 interchanges.

Scope of Work:

  • Earthworks and grading
  • Pavement construction
  • Bridge construction
  • Drainage systems
  • Road signage and lighting

مشروع طريق ساحلي بطول 120 كم يربط المدن الرئيسية على طول البحر الأحمر مع 12 جسرًا و3 تقاطعات.

نطاق العمل:

  • أعمال الحفر والتسوية
  • إنشاء الرصف
  • بناء الجسور
  • أنظمة الصرف
  • لافتات وإضاءة الطريق